Yogurt cycle details
| Delay timer | Not allowed |
|---|---|
| Crust color choice | No |
Adjustable from 6 to 12 hours in 30-minute steps; the timetable lists 12 hours.
When will the bread be ready?
Pick a start time to see when to add mix-ins and when it finishes, or enter when you want it ready to get the start time and the delay-timer setting.
Timer and manual notes
Delay Start works with Cycles 1–11, 13, 15 and 21 and can be set so the total, cycle time plus delay, reaches up to 13 hours. The manual does not recommend Delay Start for Gluten Free Bread.
Where these times come from
Planning this hamilton beach 29890 yogurt cycle time
For Hamilton Beach 29890, the useful planning number is 12 hr—but program choice should come before stopwatch choice.
Check first: Use the recipe or loading limits in the exact manual; the familiar capacity label may not apply to this program.
The duration comes from useandcares.hamiltonbeach.com; practical planning notes are editorial context and do not replace the manual.
Compare every 29890 program · Compare this program across bread machines